Selective removal of ceilings, partitions, flooring and soft MEP inside offices, retail bays and tower floors, planned around the building's own rules.

A strip-out in Miami usually happens inside a building that stays open: a Brickell tower floor, a Wynwood retail bay, a Doral office suite. The structure and neighbors remain, so the plan is mostly logistics: when the freight elevator is available, how debris leaves the floor and what keeps dust out of the common corridor.

High-rise and condominium-style buildings typically publish contractor rules covering insurance certificates, work hours, elevator reservations and protection of lobbies. We read those before pricing, because they often set the schedule more than the demolition method does.

Scope & Specifications

Typical scope
Ceilings and grid, partitions, carpet and tile, millwork, soft MEP, signage
Stays in place
Structure, shafts, risers and any life-safety systems that must remain live
Work window
Frequently nights or weekends, set by the property manager and neighbors
Debris route
Freight elevator or dock-staged carts to a container or truck
Dust control
Zip-wall containment, negative air where needed, HEPA clean-up
Humidity factor
Wet or mold-affected drywall and insulation are handled as a separate item

Equipment We Use

Electric mini loaders and scissor lifts

Move debris and reach ceilings without exhaust or damage to finished common areas

Floor scrapers and walk-behind grinders

Lift glue-down flooring, mastic and thinset from slab

Cordless saws and light breakers

Open partitions, pipe and framing selectively

HEPA vacuums and air scrubbers

Capture fine dust during removal and the final clean

Corridor and elevator protection

Keep finished lobby, hallway and cab surfaces intact

Wheeled debris carts and dock containers

Hold material off finished floors until it leaves the building

How the Work Is Sequenced

  1. Read the building's contractor rules

    Insurance, hours, elevator booking and protection requirements are confirmed with the property manager before a schedule is fixed.

  2. Check for regulated material

    Older ceiling, floor and plaster products are sampled by a qualified inspector first; the survey must be on site.

  3. Isolate and protect

    Trades shut off and cap what the scope disturbs. Corridors, cab walls and door frames are covered.

  4. Strip top-down

    Overhead systems come out first, then walls, then flooring, so nothing falls on cleaned surfaces.

  5. Clean to the agreed line

    HEPA vacuum, walkthrough against the written scope and a punch list for turnover.

Safety & Compliance

Rules, thresholds and fees change. Use these as a checklist of what to confirm, and rely on the issuing agency for current requirements.

OSHA 29 CFR 1926 Subpart T (Demolition)

Covers engineering survey, sequencing and protection of workers during demolition.

OSHA 29 CFR 1926.1153 (Respirable crystalline silica)

Applies when cutting or grinding concrete, masonry or tile; dust control and respiratory protection as required.

Florida Building Code and the Miami-Dade HVHZ

Miami-Dade is the High-Velocity Hurricane Zone; confirm with the building department which interior alterations need a permit and inspection.

Asbestos NESHAP and Florida Rule 62-257, F.A.C.

Survey by a Florida-licensed consultant and notification through the local program, administered here by Miami-Dade RER/DERM. Confirm with the agency which scopes apply.

Miami Considerations

Local note 1

Brickell and downtown towers commonly require off-hours noisy work and have limited freight capacity, so crews are sized to the elevator, not the other way around.

Local note 2

Humid, salt-laden air and past water intrusion mean ceilings and wall cavities often hide mold; we flag it during the walk and treat remediation as a separate scope.

Local note 3

Wynwood retail and warehouse conversions are often shells with slab, steel and block; strip-out there can run into light structural removal that needs engineered direction.

Local note 4

During hurricane season, loose debris and open dock doors become a wind hazard; staging is planned so materials can be secured quickly when a storm is forecast.

Commercial Strip-Out FAQs

Usually yes, with containment, protected paths and off-hours noisy work. Whether it is practical depends on the lease and the building's contractor rules, which we confirm with the property manager first.

It depends on scope and jurisdiction. Some interior work needs a permit from the City of Miami Building Department or the municipality where the building sits; confirm with them, and note that asbestos notification can apply separately.

Humidity makes hidden mold common behind finishes. We stop and flag it rather than demolish through it; assessment and remediation are separate trades.

Through the freight elevator or a designated route in covered carts, then to a dock container. The building manager sets the booking windows.