Superior Dust Containment:
Zip-poles and heavy plastic close off the work area so dust stays away from your air-conditioning system and furniture.

A remodel begins with an empty room, yet getting there should not spread dust through the rest of the property. Miami Demolition Co focuses on interior demolition that takes out only what is scheduled to go and shields everything that stays, whether it is a house or a condo unit.

Strip-outs, gut-outs and flooring removal that leave a ready shell for the next trade.Builders and designers need an open, clean shell to work from. The aim is a “contractor-ready” space, so the next trade can begin once we leave.
The kitchen and bath hold the plumbing and the cost, so they deserve the most careful removal.
Fixtures come out without harming the drywall or plumbing you plan to keep.
Tile on walls and floors removed cleanly, even when it is bonded hard.
Old tubs, toilets and heavy appliances are carried out and hauled off.

Want a more open floor plan? We clear the way for the new layout.
Partitions taken down to open up the plan, once the wall is confirmed non-structural.
Damaged or outdated surfaces removed back to the framing or block.
Old shelving and unneeded interior structures cleared out.

Skip days of heavy labor: floors are stripped to the subfloor or slab.
Boards lifted and nails pulled.
Thin-set and mortar are chipped up with purpose-built tools.
Surface left smooth for the new flooring.

Working inside someone’s home is a privilege. Miami Demolition Co follows a set routine for interior residential jobs:
Zip-poles and heavy plastic close off the work area so dust stays away from your air-conditioning system and furniture.
Protective runners cover the route between the entry and the work area, so floors avoid scuffs and scratches.
Heavy debris is not dragged through living spaces. Set paths and smaller loads keep the rest of the home intact.
Before handoff the area is vacuumed and wiped down, and we look for stray nails and splinters.

Inside a home, trust matters most. Miami Demolition Co keeps communication clear and sends a supervisor to oversee the plan, so the work is carried out with the care the house deserves.
“Our aim is to make demolition the easiest stage of the whole remodel.” — Miami Demolition Co Team
One kitchen or bathroom is typically a matter of days once access and utilities are sorted. A whole-house gut-out takes longer, and hidden conditions like water damage or old wiring can stretch the schedule. We provide a phased estimate after the site walk.
For an older building, testing what you plan to remove is a sensible first step, since some flooring, adhesives, plaster, ceiling texture and duct material may contain asbestos. Confirm what federal and Florida rules and your permit office require for your scope.
Only with a written engineering plan and the proper permit. We install temporary support as the plan directs and coordinate with your engineer and contractor. We do not guess at structure.
A licensed trade or the utility handles shut-offs and capping, and we coordinate timing. We do not open walls or fixtures until the owner or contractor confirms the utilities are off.
Yes, where the association permits it. Send the rules on hours, elevator use and debris routes and we plan crew and containment around them. The building manager normally approves any utility shut-off.
We seal the work zone, protect the exit route, cover air-conditioning returns in the area and clean as we go. Containment reduces dust but cannot eliminate it, so move valuables out of nearby rooms where you can.
A gut-out keeps the shell and clears what is inside: finishes, cabinets, flooring, fixtures and sometimes walls. In Miami that might mean stripping a block-and-stucco house to the masonry, emptying a dated kitchen, or clearing a condo unit where the building limits your working hours.
The aim is a space your contractor can rebuild with no surprises behind the drywall.
In practice, often yes, even where the permit question is separate. Federal NESHAP renovation thresholds, adopted in Florida Rule 62-257, depend on the amount and type of regulated material disturbed (for example 260 linear feet of pipe insulation, 160 square feet of other material, or 35 cubic feet). Residential buildings of four units or fewer are often exempt federally, but your permit office may still ask for a survey. Confirm with them, and when unsure, test what you plan to remove before a crew touches it.
Brickell and Coconut Grove units often sit in associations with set work hours, freight-elevator reservations, protected hallways and noise rules. Send those in writing before we plan crews and debris routes. Shutting off water or power for one unit can affect neighbors, so that coordination runs through the building manager.
List each room, what comes out (cabinets, tile, subfloor, drywall, insulation), what stays, where demolition stops, and who caps utilities. Add how debris leaves the building. A few photos of every room and the floor plan before the walk-through let us arrive with the right tools and bin size.
Related demolition services in Miami: residential demolition, commercial strip-outs, Brickell and Coconut Grove. Call (305) 570-3075 or use the form below for a written estimate.

Do not let the messy part hold up your design. Reach out to Miami Demolition Co for a written interior estimate.
Thank you for reaching out. Our team will get back to you shortly.