Schedule-Driven Planning:
Lease starts and opening dates set the clock. Phasing, and off-hours shifts where the building permits, are planned around yours.

Commercial space in Miami rarely sits empty for long. Property managers turning over a retail unit and general contractors who need a dependable demolition sub for a tower floor or warehouse both need someone who plans for building rules, access and hazards. Miami Demolition Co handles commercial demolition across Miami-Dade with that in mind.

Retail, office and industrial demolition with tight schedules and clean handoffs for Miami property teams.Interior and exterior demolition for many property types, from high-rise office floors to industrial warehouses, handled with care for occupied surroundings.
Starting a new lease? Retail and restaurant spaces are taken back to the bare shell.
Specialty equipment, walk-in coolers and heavy fixtures removed.
Storefronts, interior partitions and commercial flooring such as VCT, tile and epoxy.
Drop ceilings, ductwork and lighting taken down safely.

Clearing outdated layouts so a company can move on to the next fit-out.
Modular workstation systems dismantled quickly.
Old servers, cabling and electronics hauled off responsibly.
Dividers and glass walls removed without harming the base building.
Heavy equipment for large facilities, including tilt-up and slab work.
High-density storage systems taken apart in a safe order.
Floors opened up for new machinery or underground plumbing.
Old dock levelers and exterior concrete pads removed.

On Miami commercial jobs, access, hazard surveys, building rules and hurricane-season timing are settled well before the first wall comes down.
Lease starts and opening dates set the clock. Phasing, and off-hours shifts where the building permits, are planned around yours.
Barriers and quiet-hours scheduling reduce the impact on neighboring tenants, and extra air filtration can be specified if the project requires it.
Your building’s contractor rules, insurance terms and access limits are reviewed before we bid, so they are reflected in the price.
We work with the correct building department (City of Miami, another municipality, or Miami-Dade RER), asbestos notification and Sunshine 811 locates where they apply to your scope. Confirm each requirement with the agency.

Each commercial job has one point of contact responsible for the schedule, the building’s access rules and the handover to the next trade. We set an update rhythm at the start and flag site issues as they arise instead of saving them for later.
“We plan every commercial site as though our own business rides on it, because it does.” — Miami Demolition Co Team
Yes, within the building's rules. We plan around loading access, freight elevators, noise windows and dust containment, and coordinate shutdowns with the building engineer. Send the contractor requirements early so the schedule reflects them.
Usually the owner or general contractor, and we need the results before disturbing suspect materials. Federal NESHAP and Florida Rule 62-257 set survey and notice expectations, so confirm what applies to your scope with the permitting office.
Off-hours work can be scheduled where building and municipal noise rules allow. It is priced separately because it affects crew costs and building access, so share your preferred windows with the bid request.
Plans or a marked-up scope, any hazard survey, the building's contractor rules, access and elevator details, and your dates and phasing. The more complete the package, the more specific the bid.
Material is separated on site into the streams the project requires, such as metal, concrete and general waste, then hauled to permitted facilities. If your contract needs disposal or diversion documentation, say so in advance.
Yes. Structural and exterior demolition involves a demolition permit from the right building department, asbestos survey and notice, utility disconnects and, in some cases, historic review. If the site is in the City of Miami, that review goes through the Historic and Environmental Preservation Board. We lay out those steps in the estimate.
Commercial work in Miami usually answers to a lease start, a bid deadline or a general contractor's critical path. It spans tenant strip-outs in high-rise towers, warehouse teardowns in older industrial districts, and slab and tilt-up work near the airport corridor.
Our order of thinking: access, then hazards, then schedule.
Urban sites often have no staging area. Loading zones, lane or sidewalk closures, street-use permits and delivery windows must be arranged before the first truck rolls. On upper floors, the freight elevator calendar and after-hours rules determine how many days a crew needs.
During the site walk we ask for the building's contractor rules, insurance requirements and elevator booking process so the estimate includes them rather than uncovering them on day one.
Older commercial interiors can hold asbestos in floor tile, mastic, ceiling products, fireproofing and pipe or duct insulation, plus lead in old paint. Federal NESHAP and Florida Rule 62-257 set survey and notice expectations that scale with the work, so the owner's survey report is among the first items we request. If none exists, the owner or GC typically orders one before demolition begins. Brickell sites with long-standing prior uses may also warrant a soil review (hedge: depends on the parcel's history).
Mechanical, electrical and fire-protection shutdowns need sign-off from the building engineer. Sprinkler and alarm impairments are arranged with the owner and the fire-protection contractor, not by a demolition crew acting alone.
On open or partially demolished sites, hurricane season (June 1 to November 30) changes how we phase work. Exposed structure, stockpiled debris and loose materials need securing before a storm approaches, and Miami-Dade's High-Velocity Hurricane Zone rules apply to what is rebuilt afterward. We build that into the sequence and the schedule.
Floor plans or a marked-up demolition drawing, the hazard survey, the building's contractor requirements, access and elevator details, target start and finish dates, and phasing. With those, we return a scope listing inclusions, exclusions and assumptions line by line.
Commercial demolition around Miami: Brickell, Wynwood, Doral, Coconut Grove and interior strip-outs. Call (305) 570-3075 or use the form below for a written estimate.

From Brickell towers to Wynwood warehouses and Doral industrial parks, we help clear sites for what is built next. Contact us for a bid and a facility walk-through.
Thank you for reaching out. Our team will get back to you shortly.