Controlled mechanical teardown of concrete-block houses, tilt-up warehouses and small commercial buildings, from permits through a graded lot.

Much of Miami's older building stock is reinforced concrete block and poured concrete: block-and-stucco houses in Little Havana, flat-roofed multifamily, warehouses and tilt-up panels in Wynwood and Doral. These are heavy, stiff structures that do not behave like wood frame, so the machine, the sequence and the hauling plan all change.

A teardown here also meets a high water table and small lots. We plan around groundwater in any below-grade work, around trees that may be protected and around neighbors who sit a few feet away.

Scope & Specifications

Method
Excavators with shears, grapples and processors; hammers for slabs and footings
Typical structures
Concrete-block houses, duplexes, warehouses, tilt-up and small commercial buildings
Pre-work
Jurisdiction check, asbestos survey and notice, utility disconnects, tree and historic checks
Dust control
Continuous water misting; block and stucco generate fine dust
Groundwater
Shallow water table; footing and slab removal can need dewatering and a permit
End state
Slab and footings removed or left per contract; lot graded and stabilized

Equipment We Use

Excavators with demolition shears

Cut rebar and break down block walls and tilt-up panels

Concrete processors and pulverizers

Crush at the machine and release reinforcing steel for recycling

Hydraulic breakers

Break thick slabs, grade beams and footings

Water hoses and mist cannons

Control fine dust from stucco and block

Compact loaders and skid steers

Handle debris on small lots where larger machines cannot turn

Dump trucks and roll-offs

Move sorted material to recycling and disposal facilities

How the Work Is Sequenced

  1. Confirm jurisdiction and approvals

    City of Miami, another municipality or the County: the right building department, historic review where it applies and any tree permit come first.

  2. Hazard survey and notification

    Asbestos is surveyed before demolition, and the demolition notice goes to the agency within the required lead time.

  3. Utilities and Sunshine 811

    Electric, water, sewer and gas are disconnected and capped; a Sunshine 811 locate is requested before any excavation.

  4. Protect neighbors and trees

    Fencing, barricades, tree protection and, where needed, right-of-way arrangements are in place before the machine starts.

  5. Demolish, sort and grade

    The structure comes down in sequence, concrete and metal are separated, and the lot is graded to drain.

Safety & Compliance

Rules, thresholds and fees change. Use these as a checklist of what to confirm, and rely on the issuing agency for current requirements.

OSHA 29 CFR 1926 Subpart T (Demolition)

Requires an engineering survey of the structure and a written plan before demolition begins.

Asbestos NESHAP (40 CFR Part 61, Subpart M) and Rule 62-257, F.A.C.

Demolition notification applies to regulated facilities; in Miami-Dade, notice runs through the local program (RER/DERM). Confirm with the agency.

Florida Statutes Chapter 556 (Sunshine 811)

Excavators must notify the one-call center before digging; marks and wait times apply.

Construction stormwater (FDEP NPDES)

Larger disturbed areas may need coverage under the state construction generic permit; confirm thresholds with FDEP and the permitting authority.

Miami Considerations

Local note 1

Little Havana lots are narrow and often back onto alleys; small machines and strict dust control are the norm.

Local note 2

Coconut Grove has dense tree canopy and historic character; confirm tree permits and any preservation review before mobilizing.

Local note 3

Doral and the airport corridor have large tilt-up and warehouse slabs; the work is more about concrete processing and truck logistics than about the walls.

Local note 4

Because the Biscayne Aquifer sits near the surface, any excavation below grade should be planned around water rather than surprised by it.

Structural Demolition FAQs

It depends on where the parcel sits: the City of Miami, another municipality such as Doral or Coral Gables, or Miami-Dade County in unincorporated areas. Confirm with the parcel's folio and the local office before applying.

Demolition notification rules differ by building type, and small residential structures may be treated differently from commercial ones. Confirm with the local program; a survey is still a prudent step in older buildings.

It can be if footings or slabs sit below the water table. We flag it during planning because dewatering may need approval and affects schedule.

Sometimes, if the next project reuses it; that is a contract decision made before demolition, since it changes the scope and the inspection sequence.